Volume
33.33 ft³
1.23 cubic yards
60lb Bags Needed
75
or 112 × 40lb / 56 × 80lb

How It Works

Volume

Volume is length × width × thickness. Thickness is entered in inches while length and width are in feet, so thickness is converted to feet before multiplying.

Bag counts

Pre-mixed bags have a known yield in cubic feet per bag (roughly 0.3, 0.45, and 0.6 cubic feet for 40lb, 60lb, and 80lb bags respectively) — the total volume is divided by that yield and rounded up so you always have enough.

Example Calculation

A 10ft × 10ft slab poured 4 inches thick needs about 1.23 cubic yards of concrete — roughly 75 sixty-pound bags if using pre-mixed bags instead of a truck delivery.

Common Mistakes

  • Forgetting to convert thickness from inches to feet before multiplying — mixing units gives a wildly wrong volume.
  • Not adding a safety margin for waste, uneven ground, or spillage — contractors commonly order 5-10% extra.

Frequently Asked Questions

Should I use bags or a truck delivery?
For small jobs (a cubic yard or less), pre-mixed bags are usually more practical. For larger pours, ready-mix delivery is typically more cost-effective and easier to place consistently.
Does this account for rebar or forms?
No — this calculates concrete volume only. Rebar, forms, and other materials need to be estimated separately.